Wednesday, September 19, 2012

Steeplejacks do windows in Decatur

There no getting abound water damage, even a hundred feet up. This is First Baptist Church, Decatur by Ivey and Crook Job #513, commissioned in 1948.


Man sided windows.
P1120032-2012-09-17-Decatur-1st-Baptist-steeple-window-repair
I drive by twice a week It's big church south of the Dekalb Courthouse. I like it better up close than at a distance. It's more chunky than delicate. The second "layer" of the steeple is a Buck Crook trademark, a temple by itself.

P1080097-2012-05-08--Decatur-1st-Baptist-by-Lewis-Crook-classic-Portico-Repair-1948-51-detail-1
They've been repairing water damage since spring. See "Classical rot managment in Decatur. Where does the water want to go?"


This week they did windows, 3 big and one small.

P1120037-2012-09-17-Decatur-1st-Baptist-steeple-window-repair-new-windows-on-the-ground
The new windows look modern from the backside, the inward facing side.

P1120038-2012-09-17-Decatur-1st-Baptist-steeple-window-repair-new-windows-on-the-ground
Looks like stick-on muntins. You can see old trim parts on the left.

P1120033-2012-09-17-Decatur-1st-Baptist-steeple-window-repair-detail
Workaday steeplejacking.

P1120033-2012-09-17-Decatur-1st-Baptist-steeple-window-repair
Let's have a cheer for modern lifts.

P1120035-2012-09-17-Decatur-1st-Baptist-steeple-window-repair


P1120036-2012-09-17-Decatur-1st-Baptist-steeple-window-repair-detail


P1120040-2012-09-17-Decatur-1st-Baptist-steeple-window-repair-detail


I was too busy to watch for long and anyway it makes me a bit woozy. The men worked safely but my brain imagined falling.

P1120056-2012-09-18-Decatur-1st-Baptist-steeple-window-repair-complete-south-window-detail-flemish-bond
They were done in a day.

P1120055-2012-09-18-Decatur-1st-Baptist-steeple-window-repair-complete
It's a good look.

1 comment: